About the employer
Verification
- About the employer
- Identity verified
- Phone verified
- Email activated
How to write a winning bid
Great bids are ones that:Are engaging and well written without spelling or grammatical errorsShow a clear understanding of what is required for this specific project - personalize your response!Explain how your skills & experience relate to the project and your approach to working on it. Most of all - don't spam or post cut-and-paste bids. You will be penalized or banned if you do so
Construction Methods Specialist
$500 - $1000
Job description
- Construction methods: Prepare overall plans and solutions for large projects. Check detailed BPTC records for small projects.
- Implement and control Shopdrawing documents: Coordinate with KTCs to plan the release of Shop drawings. Prepare and check the quality of Shopdrawing documents. Coordinate with relevant departments to control HSTK main items to promptly detect/propose adjustments to inappropriate issues.
- Implement and control as-built drawing documents: Prepare and check the volume and quality of as-built drawing documents to serve settlement/As-built separation documents. Check for discrepancies between the completed documents and the DSTK (if any).